Construction of the New Locks on the Atlantic Side – Horizontal View

 

Description

Aerial view from Gatun Lake showing the progress of the removal of 15 million cubic meters of material to build the new Post-Panamax locks. These structures will be located within the footprint from the first excavations performed between 1939 and 1942.