| Design and Construction of the Third Set of Locks | ||||
|---|---|---|---|---|
| Table of Contents | ||||
| Volumen I | ||||
Part 1 |
Instructions to Tenders | |||
Part 2 |
Tender Forms | |||
Part 3 |
Forms of Security | |||
A16Part 4 |
(Not Used)A16 | |||
Part 1 |
Locks Performance and Design Criteria Locks Project Main Performance Requirements |
|||
Part 2 |
Supplemental Requirements Locks Systems Performance Requirements |
|||
Part 3 |
General Requirements | |||
Part 4 |
Requirement Drawings | |||
| Conditions of Contract | ||||
| Employer's Evaluation Criteria | ||||
| General and Administrative | ||||
Part 1 |
Overall Execution Plan | |||
A16Part 2 |
Key PersonnelA16 | |||
A7Part 3 |
(Not Used)A7 | |||
Technical |
||||
Part 4 |
Design-Build Execution Methodology | |||
Part 5 |
Design Plan | |||
Part 6 |
Construction Plan | |||
Part 7 |
A19Maintenance ServicesA19 | |||
Part 8 |
Training of ACP Personnel | |||
A7Part 9 |
Price ProposalA7 | |||
A16Volumen V |
Contractor's Proposal (Instructions)A16 | |||
| General and Administrative | ||||
Part 1 |
Overall Execution Plan | |||
A16Part 2 |
Key PersonnelA16 | |||
A7Part 3 |
(Not Used)A7 | |||
| Technical | ||||
Part 4 |
Design-Build Execution Methodology | |||
Part 5 |
Design Plan | |||
Part 6 |
Construction Plan | |||
Part 7 |
A19Maintenance ServicesA19 | |||
Part 8 |
Training of ACP Personnel | |||
A7Part 9 |
Price ProposalA7 | |||
| Reference Douments | ||||
Part 1 |
Reference Drawings | |||
A7Part 2 |
Geotechinical Reports | |||
A16Part 3 |
Seismic Data for Temporary StructuresA16 | |||
Part 4 |
A11Environmental ReportsA11 | |||
Part 5 |
Conceptual Design of Post Panamax Locks (Pacific) (CPP, May 2003) | |||
Part 6 |
Update of Pacific Locks Conceptual Design and Harmonization of Atlantic Locks Conceptual Design (CPP, May 2005) | |||
Part 7 |
Hydrometeorological Report | |||
Part 8 |
A19Filling and Emptying Systems Reference DocumentsA19 | |||
Part 9 |
Handbook of Lockage Procedures (existing locks) | |||
Part 10 |
Blasting Records | |||
Part 11 |
Widening and Deepening of the Pacific Entrance and South Approach Channel to the Third Set of Locks of The Panama Canal (including drawings) | |||
Part 12 |
Feasibility Evaluation of a Tug Assisted Locks Vessel Positioning System | |||
Part 13 |
Tugboat Fleet Principal Particulars | |||
Part 14 |
A19Design [Specification and Drawings] for East Barrier Dam 2E, West Barrier Dam 1W and West Barrier Dam 2W StructuresA19 | |||
Part 15 |
Programa de Ampliación del Canal: Canal de Aproximación Norte Pacífico Proyecto No. PAC-2 (including drawings) | |||
A11Part 16 |
Electrical Works Reference DataA11 | |||
A11Part 17 |
Miraflores Swing Bridge Reference DocumentsA11 | |||
A16Part 18 |
Gatun Lake Dump Sites Bathymetric DataA16 | |||
A16Part 19 |
AdministrativeA16 | |||
A19Part 20 |
Traffic ScenariosA19 | |||
| Employer's Data | ||||
Part 1 |
Geotechnical Interpretive Report | |||
Part 2 |
Topographical Data | |||
Part 3 |
Seismic Design Criteria Data: Accelerations and Response Spectra |
|||